Hello,
My name is Mike
And I have a question in regards to the amount of fill needed to bring a vacant lot up to “grade level”.
The lot is 112’ x 87’ and I need to bring in fill to elevate the finished level up 4’.
Help!!

Thanks

 


Hi Mike,

There are 3 feet in a yard so

112 feet is 1123 yards
87 feet is 873 yards
4 feet is 43 yards

Thus you need

 1123  873  43 = 1443.6 cubic yards.

Penny